Call Us:
775.284.1964
|

Williams Circle Project

Reno, Nevada | 2014 

Residential Foundation Construction

To build a home on this lot, 48" storm drain was relocated outside the building footprint.  The 13' deep storm drain was excavated, relocated, and backfilled without adequate compaction.  The result was a portion of the structure settling over 12". VersaGrade underpinned and re-leveled the worst part of the structure and held it in place within 1/2" of where it was originally constructed.

View our other projects

versa grade excavating construction

Project Gallery

  We have a staff ready to help you with your project solutions!

Contact VersaGrade at 775.284.1964 to discuss your residential foundation repair projects.
Reach Out
© 2021 VersaGrade Inc. | All Rights Reserved | Privacy Policy
linkedin facebook pinterest youtube rss twitter instagram facebook-blank rss-blank linkedin-blank pinterest youtube twitter instagram