The Stateline Boardwalk Project was a small part of a larger 30+ mile long Nevada Stateline-to-Stateline Bikeway Project along the East shore of Lake Tahoe. The intent of the project is to create a shared-use path that meets American Association of State Highway and Transportation Officials (AASHTO), and Americans with Disabilities Act (ADA) standards to serve a broad spectrum of users. Since the area the boardwalk spanned was environmentally sensitive, the project prohibited the use of mechanized equipment with tracks or tires. VersaGrade devised and implemented means to install and test the piles by hand without equipment support. A total of 148 Piles and braces were installed, using handheld equipment, on this project by our Reno contractors.